Power and startup
This chapter has the following sections:
• Power up
4.1
Power cables
An AC power cable for the GMU/ACU is included in the delivery.
4.2
Power up
4.2.1
To connect the power cable to the ACU and GMU
1. Connect the power cable to the GMU.
2. Connect the power cable to the GMU.
4.2.2
Power-up procedure
1. Switch on the ACU. The unit starts up and goes through an initialization procedure:
• ACU POST
• Antenna Initializing
• Antenna POST
• READY
This may take some time (up to a couple of minutes).
2. The FV-110GX is ready to be calibrated (for first time power up) or receive data from
the GMU (when in normal operation).
Figure 4-1: ACU - to connect power to DC Input
Figure 4-2: GMU - to connect AC power
Chapter 4
4
4-1