Sign In
Upload
Manuals
Brands
Furuno Manuals
Touch terminals
FV-110GX
Furuno FV-110GX Manuals
Manuals and User Guides for Furuno FV-110GX. We have
1
Furuno FV-110GX manual available for free PDF download: Operator's Manual
Furuno FV-110GX Operator's Manual (188 pages)
GX TERMINAL
Brand:
Furuno
| Category:
Touch terminals
| Size: 12.46 MB
Table of Contents
Safety Instructions
5
Table of Contents
7
Foreword
12
System Configuration
13
Equipment List
14
Chapter 1 Introduction
17
FV-110GX System
17
Overview
17
Above Deck Unit (ADU)
18
Antenna Control Unit (ACU)
21
GX Modem Unit (GMU)
23
Satellite Type Approvals
23
Service Activation
23
Part Numbers and Options
24
Applicable FURUNO Model and Part Numbers
24
Options for FV-110GX
24
Chapter 2 Installation
25
What's in the Box
25
To Unpack
25
Initial Inspection
26
Tools Needed
26
Transport of the Antenna
26
Site Preparation
27
General Site Considerations
27
Obstructions (ADU Shadowing)
28
Blocking Zones with Azimuth and Elevation
29
Safe Access to the ADU (Radiation Hazard)
30
Ship Motion and Offset from the Ship's Motion Centre
31
Mast Foundation and Height
32
Interference from Radar, GPS, L-Band and Other Transmitters
37
Condensation, Water Intrusion and Deposits
40
Installation of the ADU
41
To Install the ADU
42
To Open and Remove the Service Hatch
47
To Ground the ADU
49
Alternative ADU Cable
50
Installation of the ACU
51
To Install the ACU
51
To Ground the ACU
51
Installation of the GMU
52
To Install the Modem
52
To Ground the GMU
52
Provisioning Key and Terminal Type
53
To Connect the ADU, ACU and GMU
53
Chapter 3 Interfaces
55
Interfaces of the ACU
55
Leds, Display, Keypad and Connectors
55
AC Input Connector
56
ADU Connector
56
Rx in and Tx out Connectors
56
NMEA 0183 Connector
57
And RS-422 Connectors
58
LAN1 - 4 Connectors
59
Interfaces of the GMU
60
Connector Panel
60
Rx in and Tx out Connectors
60
And RS-422 Connectors
61
LAN Connectors (8 + 2)
62
I/O Connector for Tx Mute and Rx Lock
62
Chapter 4 Power and Startup
63
Power Cables
63
Power up
63
To Connect the Power Cable to the ACU and GMU
63
Power-Up Procedure
63
Initialisation Steps in Daily Use
64
FV-110GX Operational
64
Chapter 5 Configuration
65
Introduction to the Built-In Web Interface
65
Overview
65
Connecting to the Web Interface
65
Heading Input and Position System
68
Calibration
71
Azimuth Calibration
71
Service Profile for Calibration
74
Cable Calibration
75
Manual One Touch Commissioning (BUC Calibration)
76
Operation in Gyro-Free Mode
77
Fixed TX if Principle
78
Configuration with the Web Interface
79
Overview and Dashboard
79
To Set up Blocking Zones (RX and TX)
84
To Configure the LAN Network
87
E-Mail Setup
89
Setup of Reports, Syslog and SNMP Traps
90
Administration
95
Keypad and Menus of the ACU
100
ACU Display and Keypad
100
Navigating the Menus
101
The Menu Tree
102
Brightness of the Display
105
Power-Cycle of the ACU and ADU
105
SNMP Support
106
Chapter 6 Installation Check
107
Installation Check List: Antenna
107
Installation Check List: ACU and GMU, Connectors and Wiring
108
Installation Check List: Functional Test in Harbor
109
Chapter 7 Service
111
To Get Support
112
Options for Support
112
Reset to Factory Default
115
Reset to Factory Default - GMU
116
Line up Procedure
116
Self Test
118
Software Update
119
Prerequisites
119
Software Update (ADU, ACU)
119
Software Update (GMU)
121
Satellite Profiles and VSAT Modem Profiles
122
Satellite Profiles
122
Modem Profiles
123
Status Signalling with Leds and Status Messages
125
Leds of the ADU Modules
125
Leds in the ACU
126
Leds of the GMU
126
Removal and Replacement of the ACU and GMU
127
Removal and Replacement of ADU Modules
127
Troubleshooting
130
Overview
130
Event List for Troubleshooting
130
Diagnostics Report for Troubleshooting
130
To Return Units for Repair
130
Appendix A Ground and RF Protection
131
Safety
131
ESD Protection
131
Why Is and Ground Connection Required
131
Recommendations
131
To Ground the ACU
132
To Ground the ADU
133
Alternative Ground for Steel Hulls
133
To Ground the ACU
134
To Ground the ADU
134
Alternative Ground for Aluminum Hulls
136
To Ground the ACU
136
To Ground the ADU
136
Alternative Ground for Fibre Glass Hulls
138
To Ground the ACU
138
To Ground the ADU
138
Separate Ground Cable
139
To Construct a Ground Cable
139
Ground Cable - Connection
140
Isolation of the ADU from the Mounting Base
140
RF Interference
141
Jumper Cable for Grounding
142
Appendix B System Messages
143
Event Messages - Overview
143
List of ADU Events
144
List of ACU Events
150
Appendix C Command Line Interface
155
Introduction
155
Telnet Connection
155
Help
156
Conventions
156
Supported Commands
156
Help
157
Config
157
Modem
158
Satellite
158
Status
158
System
158
Track
158
Zone
163
Appendix D Approvals
165
OEM Declaration
166
Specifications
167
Index
179
Declaration of Conformity
187
Advertisement
Advertisement
Related Products
Furuno FELCOM 19
Furuno FV-110
Furuno FAR-2167DS
Furuno FR-8251
Furuno FR-7100D
Furuno FAP-55
Furuno FAR-1523-BB
Furuno FR-2125
Furuno FAR-2228-BB
Furuno FSV-8503
Furuno Categories
Marine Radar
Marine Equipment
Sonar
Monitor
GPS
More Furuno Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL