Installation Of The Adu - Furuno FV-110GX Operator's Manual

Gx terminal
Table of Contents

Advertisement

2.3

Installation of the ADU

The following sections describe the installation and grounding of the ACU. The ADU is
shipped fully assembled. You have to install it on the mast and attach the ADU cable.
Tag line
Before installing the ADU read the following guidelines.
WARNING! Use a strong webbed sling with a belt to
lift the ADU without damaging the radome. Make sure
that the sling can carry the ADU's weight (126 kg).
WARNING! The ADU may be subject to swaying
motions in windy conditions. Always use tag lines to
stabilise the ADU during hoisting.
Current antenna
Figure 2-15: Use of strong sling with a belt and tag lines for safe hoisting
Webbed sling with belts
Tag lines
Installation of the ADU
Tag line
New antenna
2-17

Advertisement

Table of Contents
loading

Table of Contents