Measure:vpp - Agilent Technologies InfiniiVision 5000 Series Programmer's Manual

Hide thumbs Also See for InfiniiVision 5000 Series:
Table of Contents

Advertisement

5
Commands by Subsystem

:MEASure:VPP

Command Syntax
:MEASure:VPP [<source>]
<source> ::= {CHANnel<n> | FUNCtion | MATH}
<n> ::= {1 | 2 | 3 | 4} for the four channel oscilloscope models
<n> ::= {1 | 2} for the two channel oscilloscope models
The :MEASure:VPP command installs a screen measurement and starts a
vertical peak- to- peak measurement. If the optional source parameter is
specified, the current source is modified.
Query Syntax
:MEASure:VPP? [<source>]
The :MEASure:VPP? query measures the maximum and minimum vertical
value for the selected source, then calculates the vertical peak- to- peak
value and returns that value. The peak- to- peak value (Vpp) is calculated
with the following formula:
Vmax and Vmin are the vertical maximum and minimum values present on
the selected source.
Return Format
<value><NL>
<value> ::= vertical peak to peak value in NR3 format
See Also
290
(see
page
586)
Vpp = Vmax - Vmin
"Introduction to :MEASure Commands"
":MEASure:SOURce"
":MEASure:VMAX"
on page 288
":MEASure:VMIN"
on page 289
":MEASure:VAMPlitude"
Agilent InfiniiVision 5000 Series Oscilloscopes Programmer's Guide
on page 257
on page 279
on page 285

Advertisement

Table of Contents
loading

Table of Contents