Aborting All Tests - Paradyne FrameSaver FLEX 9123 User Manual

Table of Contents

Advertisement

6. Troubleshooting
Procedure
To start and stop a loopback or a set-pattern test:

Aborting All Tests

Use the Abort All Tests selection from the Test menu to abort all tests running on
all interfaces, with exception to DTE-initiated loopbacks. To abort individual tests
that are active, see
Procedure
To abort all tests on all interfaces:
6-16
1. Follow this menu selection sequence:
Main Menu → Test
2. Select an interface and test (e.g., Network or Data Port PVC Tests) and
press Enter.
The selected test screen appears. Start appears in the Command column.
Inactive appears in the Status column.
3. Select the Port number and press Enter.
4. Select the DLCI number and press Enter if a PVC test has been selected.
The cursor is positioned at Start in the Command column of the first available
test. Start is highlighted.
5. Highlight the Start command for the test you want to start and press Enter.
Stop now appears and is highlighted, and the status of the test changes to
Active.
6. Press Enter to stop the test.
Start reappears and the status of the test changes back to Inactive.
7. View the length of time that the test has been running in the Result column.
Starting and Stopping a Test
1. Follow this menu selection sequence:
Main Menu → Test
2. Select Abort All Tests and press Enter.
Command Complete appears when all tests on all interfaces have been
stopped.
NOTE:
Abort All Tests does not interrupt DTE-initiated loopbacks.
August 2001
on page 6-15.
9123-A2-GB20-20

Advertisement

Table of Contents
loading

Table of Contents