Chapter 7: Installing Gs970Emx/20, Gs970Emx/28, And Gs970Emx/52 Switches On A Wall; Installation Guidelines; Figure 50: Gs970Emx/20 And Gs970Emx/28 Switches On A Wall With The Brkt-J24 Brackets Kit; Figure 51: Gs970Emx/52 Switch On A Wall - Allied Telesis CentreCOM GS970EMX/52 Installation Manual

Gigabit layer 3 lite access switches with 10 gigabit uplinks
Table of Contents

Advertisement

Chapter 7: Installing GS970EMX/20, GS970EMX/28, and GS970EMX/52 Switches on a Wall

Installation Guidelines

100
The guidelines to installing GS970EMX/20, GS970EMX/28, and
GS970EMX/52 Switches on a wall are listed here:
The GS970EMX/20 and GS970EMX/28 Switches require the
BRKT-J24 wall brackets kit for wall installations. The kit comes
with four identical brackets. Refer to Figure 32 on page 79. The kit
is sold separately.
The GS970EMX/52 Switch is installed on a wall with the two
wall/equipment rack brackets included with the unit. Refer to
Figure 14 on page 50.
You can install the switches with the front panels facing up, left or
right. Refer to Figure 50.
Figure 50. GS970EMX/20 and GS970EMX/28 Switches on a Wall with the
Figure 51. GS970EMX/52 Switch on a Wall
BRKT-J24 Brackets Kit

Advertisement

Table of Contents
loading

Table of Contents