170
ultimail Operator Manual
Setting up connections
On the postage meter:
• Connect the power cable to the
postage meter.
The socket for the power connection is
on the back of the ultimail postage
meter.
• Connect the phone cable to the
postage meter phone socket. Make
sure that spring is in correct position.
• Plug connecting cable of feeder /
sealer in 25-pin interface on postage
meter and tighten screws.
The interface is marked with the
sign.
• Connect postage meter power cable to
a grounded single-phase power socket.
• Connect feeder power cable to a
grounded single-phase power socket.
• Connect phone cable to a phone
socket (analogue). This is usually a fax
connection.
Need help?
Do you have a question about the ultimail and is the answer not in the manual?
Questions and answers