Panasonic S-36PU1E5A Technical Data & Service Manual page 645

R410a models
Hide thumbs Also See for S-36PU1E5A:
Table of Contents

Advertisement

8-17. CZ-RWSL2
1. Accessories
No.
Accessories
1
Operation Panel
2
Display
3
Remote Control
4
R
e
m
o
e t
C
o
n
r t
l o
H
o
d l
r e
Installing the Display/Operation Panel
Resin Panel
Installing the Operation Panel
(1)
Remove the 2 screws and remove cover A from the back of the panel. (Fig. 8-15)
(2)
Fasten the operation panel to the location in the diagram below with the 2 enclosed screws (4
(3)
Pass the wiring for the display (W2, 6P white connector) through the back of the panel.
Fig. 8-15
Installing the Display
(1) Cover B is fitted inside cover A, so remove the 1 screw and detach it by pressing on it from the front side of the panel.
(Fig. 8-17)
(2) Connect the wiring (W2) for the display that is sticking out from the operation panel and fit the display into the panel.
Make sure the 6P white connector is firmly connected all the way in.
(3) Bend the lead wire of the display into shape so it does not come in contact with the louver shaft. There is a groove in the
circled part in diagram 3 that is for passing wire through; press the lead wire into this groove so there is no slack in it.
(4) Attach cover A. When doing so, press it securely into the place indicated by the arrow in Fig 8-18.
(5) Shape the lead wire of the operation panel appropriately and fasten it with the enclosed plastic clamp.
(6) Install the ceiling panel.
Quantity
No.
1
4
5
1
6
1
7
1
8
Cover A
Cover B
Fig. 8-17
Accessories
Dry-cell Batteries
Users Manual
Truss Self-Tapping Screws
4 X 16
Pan Head Self-Tapping Screws
4 X 10
Plastic Clamp L150
Display wiring (W2)
Fig. 8-16
Display
Connect
8-21
Quantity
2
1
2
4
3
10). (Fig. 8-16)
X
Enclosed screws
(4 X 10)
Operation Panel
Fig. 8-18
8

Advertisement

Table of Contents
loading

Table of Contents