Replacing The Probe [Sm - Frontier LP7500 Service Manual

Qss-37 series
Table of Contents

Advertisement

Distributed by: minilablaser.com

Replacing the probe [SM]

! ! ! ! Procedure
1.
Pull out the replenishment package unit.
2.
Remove the replenishment package.
3.
Remove the protection cover of the SM I/O PCB. (one screw)
Protection cover
4.
Disconnect the tray unit connectors.
J/P601: Tray unit A
J/P600: Tray unit B
5.
Remove the tray units.
2. Lift it up.
Tray unit A
6.
Remove the probe nut and the probe.
STB
CD-C
7.
Assemble the new probe, then tighten the probe nut securely using the probe replacing jig.
I
MPORTANT
• The O-ring is attached to the new probe.
• The probe (including the O-ring) should be used properly for each solution.
27820
G050891
Tray unit B
1. Press the lever.
G050892
BF-A
BF-B
CD-B
CD-A
27820
Replenishment package unit
Probe nut
Probe
O-ring
Probe holder
G050893
1/2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents