EAS23710
ENGINE REMOVAL
Removing the exhaust pipe
12 Nm (1.2 m
20 Nm (2.0 m
kg, 15 ft
•
2
1
20 Nm (2.0 m
kg, 15 ft
•
10 Nm (1.0 m
kg, 7.2 ft
•
Order
Seat/side cover
Fuel tank
Throttle bodies
Drain the engine oil.
1
Exhaust band
2
Muffler
3
EXUP cover
4
EXUP cable
O
sensor
5
2
6
Exhaust pipe/exhaust gasket
7
Exhaust pipe bracket
8
Oil cooler
9
O-ring
10
Air scoop (left/right)
11
Crankcase breather hose
12
Ground lead
kg, 8.7 ft
Ib)
•
•
Ib)
•
12
7
5
Ib)
•
4
3
Ib)
•
45 Nm (4.5 m
Job/Parts to remove
10
11
20 Nm (2.0 m
6
kg, 33 ft
Ib)
•
•
Q'ty
Refer to "GENERAL CHASSIS" on page
4-1.
Refer to "FUEL TANK" on page 6-1.
Refer to "THROTTLE BODIES" on page 6-4.
Refer to "ENGINE" on page 3-4.
1
Loosen
1
1
2
1
1/4
1
1
2
1/1
1
1
Disconnect.
For installation, reverse the removal proce-
dure.
5-1
ENGINE REMOVAL
10 Nm (1.0 m
kg, 7.2 ft
•
8
9
kg, 15 ft
Ib)
•
•
10 Nm (1.0 m
kg, 7.2 ft
•
6
25 Nm (2.5 m
kg, 18 ft
•
Remarks
Ib)
•
Ib)
•
Ib)
•