Powering on the Router

Checking before powering on the router
Before power-on, check that:
The power cord and PGND cable are correctly connected.
The voltage of the power supply is the one indicated on the label of the router.
The console cable is properly connected, the console terminal has been started, and the
configuration parameters have been set.
WARNING!
Before power-on, you must be aware of where the power switch is located so that you can disconnect the
power supply in time in case of an accident.
Powering on the router
Turn on the site power.
Step1
Turn on the power switch on the router.
Step2
Checking/operating after power-on
After powering on the router, check that:
The LEDs on the front panel are normal.
1.
The console terminal display is normal.
2.
For the local configuration, after you power on the router, you can see the startup banner (refer to section
Startup Process
on page 32).
31

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MSR 20-1X and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Msr 900

Table of Contents