Assembling The Tilt Ram - Yamaha F200C Service Manual

Hide thumbs Also See for F200C:
Table of Contents

Advertisement

3. Install the balls 7, manual release spring
8, and bracket 9 by installing the bolts
0, then tightening them to the specified
torque.
Gear pump bracket bolt 0:
7 N·m (0.7 kgf·m, 5.1 ft·lb)
4. Install the relief valve seal A and ball B
into the gear housing 1 5.
69J1D11
Power trim and tilt unit
Up-relief lock screw a height
(from the top of the gear housing):
1.8–2.0 mm (0.071–0.079 in)
Down-relief lock screw b depth
(from the top of the gear housing):
1.5–2.0 mm (0.059–0.079 in)
5. Install the filters C and gear pump D by
installing the bolts E, then tightening
them to the specified torque.
6. Install the manual valve F.
Gear pump bolt E:
7 N·m (0.7 kgf·m, 5.1 ft·lb)

Assembling the tilt ram

1. Install the new dust seal 1, O-rings 2
and 3, and backup ring 4 into the tilt
cylinder end screw 5.
1
2
3
4
5
6
7
8
9
7-36

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Lf200cF225cLf225cF200trLf200trlF225tr ... Show all

Table of Contents