6.6.5 Relationship between remote operation and RUN/STOP status of the
CPU module
(1) Relationship between remote operation and RUN/STOP status of the CPU
module
Table6.9 shows the operating status of the CPU module according to the combination of remote operation and
RUN/STOP status.
RUN/STOP status
RUN
STOP
*1: When performing the operation using a RUN contact, "RUN-PAUSE contact" must be set in the PLC system tab of the PLC
parameter dialog box.
*2: When performing the operation using a PAUSE contact, "RUN-PAUSE contact" must be set in the PLC system tab of the
PLC parameter dialog box.
In addition, the PAUSE enable coil (SM206) must be turned on.
*3: The "Allow" checkbox for the remote RESET operation must be selected in the PLC system tab of the PLC parameter
dialog box.
*4: The remote RESET and remote latch clear operations are enabled if the CPU module status is changed to STOP by the
remote STOP operation.
*5: The STOP status includes a case where the CPU module is stopped due to an error.
(2) Remote operations from a single GX Developer
When remote operations are performed from a single GX Developer, the operating status of the CPU module will
be the status of the last remote operation performed.
(3) Remote operations from multiple GX Developers
Any remote operation from other GX Developers via other stations cannot be performed to the CPU module
where remote operations are being performed from GX Developer connected.
To perform any remote operations from another GX Developer, cancel the remote operation by performing the
remote RUN operation from the same GX Developer that is performing the current remote operation.
For example, even if the remote STOP or RUN operation is performed from another GX Developer to the CPU
module where the remote PAUSE operation has been performed by GX Developer connected, the CPU module
remains in the PAUSE status.
Once after the remote RUN operation is performed from the same GX Developer that is performing the remote
PAUSE operation, remote operations from another GX Developer will be enabled.
Table6.9 Operating status of the CPU module
*1
STOP
RUN
RUN
STOP
STOP
STOP
Remote operation
*2
*3
PAUSE
RESET
Operation
PAUSE
*4
disabled
*5
STOP
RESET
CHAPTER6 FUNCTIONS
Latch clear
*4
Operation disabled
Latch clear