Motorola Solutions AP-6511 Access Point System Reference Guide
20.Select
to the last saved configuration.
6.6.1 Smart RF Configuration and Deployment Considerations
Smart RF Policy
Before defining a Smart RF policy, refer to the following deployment guidelines to ensure the configuration
is optimally effective:
• The Smart RF calibration process impacts associated users and should not be run during business or
production hours. The calibration process should be performed during scheduled maintenance intervals
or non-business hours.
• For Smart RF to provide effective recovery, RF planning must be performed to ensure overlapping
coverage exists at the deployment site. Smart RF can only provide recovery when Access Points are
deployed appropriately. Smart RF is not a solution, it's a temporary measure. Administrators need to
determine the root cause of RF deterioration and fix it. Smart RF history/events can assist.
6-64
OK
to update the Smart RF Coverage Hole Recovery settings for this policy. Select
Reset
to revert