Removing An Existing Expansion Sub-Module; Cabling - Avaya P333R-LB User Manual

Stackable load balancing switch
Table of Contents

Advertisement

Removing an Existing Expansion Sub-module

1
Loosen the screws by turning the knobs.
2
Grasp the two knobs one near each side of the front panel, and pull gently but
firmly towards yourself.
3
Insert another expansion sub-module or the blanking plate.
Note: The Avaya P330 switch must not be operated with the expansion slot open;
the expansion sub-module should be covered with the supplied blanking plate if
necessary.
Note: X330GT2 sub-modules are hot swapable and can be inserted or removed in an
operating base unit.

Cabling

A Category 5 copper cable with RJ-45 termination should be used. You should use
all eight wires in the cable.
The maximum copper cable length connected to a 1000Base-T port is 100 m
(328 ft.)
Avaya P333R-LB User's Guide
Appendix B
Specifications
371

Advertisement

Table of Contents
loading

Table of Contents