Gateway Installation - AT&T SB67010 PSTN Installation Manual

Hide thumbs Also See for SB67010 PSTN:
Table of Contents

Advertisement

Synapse Installation Guide

Gateway Installation

To install the Gateway:
1. Install a Gateway first. Plug the AC plug into an electrical outlet not controlled by a
wall switch and the DC plug into the DC jack, as shown in Figure 14. Wait up to one
minute until the screen lights up.
2. Plug a gray Cat.-5 LAN cable for the PSTN Gateway or SIP Gateway or yellow Cat.-6
LAN cable for the T1 Gateway into the Ethernet port marked LAN. Use the supplied
cables or a comparable substitute. Plug the other end of the cable into your
office LAN. The T1 Gateway is Gigabit Ethernet (GigE) capable, so it has a Cat.-6 LAN
cable. The Desksets and other devices require only Cat.-5 cables.
PSTN Gateway
T1 Gateway
SIP Gateway
The Gateway takes about a minute to power up.
After another Synapse device is installed, and after the Gateway has found the
network and the other Synapse device, Synchronized appears on the third line of
the display as shown in Figure 15 (PSTN Gateway shown). This is the Idle screen.
The time and date may not be correct. You can set the time and date on the System
Basic Settings page in the WebUI or using the Deskset Admin Settings menu.
Installation
Figure 14. Gateway Power and LAN Connections
Figure 15. Gateway Idle Screen, Synchronized
For more information, see the Synapse Administrator's Guide at
www.telephones.att.com/synapseguides
LAN
33
Back to Contents
DC Power
.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sb67060 t1Sb67070 sipSb67020Sb67025Sb67080Synapse

Table of Contents