Maytag 56326 Service Manual page 39

Maytag 56326 side-by-side and top mount refrigerator
Table of Contents

Advertisement

S l o w l y o p e n h an d va l ve an d te mp o -
ra ry p ie rc i n g va l ve an d di s ch a r g e
s ys te m fo r a t l e a st f i ve mi n u tes o r u n til
r e fr i g e ra n t i s co mp l ete l y r el e a se d .
O n u ni t s w i t h co l d fre e zer co mp a r t-
m e n t s t h e e va po ra to r ca n b e wa r m e d
to a i d i n p u rgi n g r efri g e ra nt. T h is is
a c c o m pl i s h e d o n b y ad va n cin g th e
d e f ro st t i me r to e n e rg ize th e de fr o st
h e at e rs .
R e m o ve h a n d va l ve a n d p u rg e ho se s.
R e m o ve va l v e co re fr om di sch ar g e
l i n e a c c e s s va l ve .
Re m o ve a n d re p la ce co mp re sso r .
W h e n b ra zi n g u se a h ea t si nk on th e
di sch a rg e l i n e to pr eve n t d a mag e to
t h e "O " ri n g se a l i n th e a cce s s va lve
b o dy . R e m e mb e r to re move th e te m -
p o ra ry p i e rci ng va lve fro m th e i n op e r -
at ive compr essor process stub. D o
not install it on the replacement com-
pressorprocess stub or suction line.
Install a new r eplacement dr ier .
12. Connect charging hose to bottom of
charging cylinder . At tach hand valv e
to loose end of charging hose,
13. P ur ge char ging hose wit h r efr iger ant
and close hand valve.
14. Attach hand valve to access valve.
C harge in 4 oz. of r efr igerant for leak
check. Close hand valve. Wai t ap-
proxim ately 5 m inut es f or pres s ure to
equalize. (Leak check low side.)
R un com pressor for 3 m inutes to
sweep syst em. ( Leak check high
s i d e . )
Close bot tom valve on charging c yli n-
der, slowly r elease r efr igerant con-
tained in charging hose by loos ening
hose coupler at char ging cylinder . Af-
ter r efr igerant is released, disc onnect
hose at char ging cylinder valve.
CAUTION: keep refrigerant away from
fingers to prevent physical damage.
Connect purge hose to loose end of
charging hose, slow ly open hand
valve and run compr essor for addi-
t i o n a l 5 m i n u t e s w h i l e d i s c h a r g i n g 4
oz. sweep char ge.
Remove hand valve, install valv e c ore
bef ore t urning compr essor of f.
2 0. Tur n compr essor off .
2 1 . R e p l a c e c h a r g i n g h o s e o n l o w e r v a l v e
of charging cylinder, purge hos e w i th
r efr igerant and close hand valv e.
1 5 .
1 6 .
1 7 .
9 .
1 8 .
1 0 .
1 1 .
1 9 .
3 - 1 9

Advertisement

Table of Contents
loading

Table of Contents