Installation
6
7
8
32
Duplex (Dual-Active) Configuration
Set the SCSI IDs. The IDs are configured via the Operator Control Panel
using the predefined sets. Access the Options menu and select "SAFTE
CHAIN ID" then choose "Master" for the subsystem identified as the master
subsystem and "Slave 1" for the subsystem identified as the first slave
subsystem and "Slave 2" for the second slave subsystem.
After setting the subsystem identification you must power cycle the
subsystems. Observe normal power cycling precautions by waiting a
minimum of five (5) seconds before applying power again.
Proceed with completing the installation by configuring the array, refer to
Chapter 3 Configuration.