InfiniBand Switch Platform Hardware User Manual
Revision History
Table 1 - Revision History of this User's Manual
Revision
1.6
Feb. 2014
1.5
Sept. 2012
1.4
Aug. 2011
1.3
Oct. 2010
1.2
Oct. 2010
1.1
Aug. 2010
1.0.1
July 2010
1.0
July 2010
About this Manual
This manual provides installation and set-up instructions for the IS5200 GT series QSFP
Chassis InfiniBand Switch Platform.
Intended Audience
This manual is intended for users and system administrators responsible for installing
and setting up the chassis platform.
The manual assumes familiarity with the InfiniBand
Mellanox Technologies
Date
Rearranged document: Consolidated installation sections under
Chapter 1, "Installation," on page
on page
12; and re-ordered sections).
Added:
•
Figure 49, "Management Module LEDs," on page 57
Updated:
•
Section 1.4, "Power Supply Redundancy," on page 15
•
Section 1.6.1.5, "Installing the Shelf," on page 21
•
Section 1.6.2, "Installing the Cable Holder," on page 25
•
Section 1.9, "Hot Swap Insertion and Extraction," on page 35
•
Section 7.1, "Disassembling the Chassis," on page 78
•
Appendix A, "Installation Safety Warnings," on page 80
•
Added figure11.
•
Added information regarding inserting the bottom spine first. Insert spines
from bottom to top.
•
Fixed broken links
•
Added step to remove plastic covering.
•
Added IBM Lift tool
Fixed Installation kit parts
Added air flow direction
•
Removed the Chassis Rail from the installation kit and from the installation
instructions.
•
Added weight lifting warning
•
Added step to Installation procedure
"Remove all protective plastic film from all sides and top of the chassis."
•
Added cable power classes
•
Added last page with barcode
•
Changed Installation procedure to include Remove all FRUs
•
Need 4 people to lift
First release
Details
10; updated
Chapter 1, "Overview,"
®
architecture specification.
8