Figure 29: Intact Vs Defected Power Pin Holders - Mellanox Technologies MIS5200Q-4DNC Hardware Installation Manual

216-port infiniband qdr switchx switch platform
Hide thumbs Also See for MIS5200Q-4DNC:
Table of Contents

Advertisement

InfiniBand Switch Platform Hardware User Manual
4. Check power connector's integrity. Look for any damage on the power connector
casing or blades damage, or any deviations from the pass criterion show in Figure 29.
5. Start with the ejector handle fully open; that is, at 45 degrees to the front panel of the
leaf.
6. Holding the leaf by its sides, carefully set the leaf board into the chassis.
7. Applying equal pressure on both sides of the leaf board, slowly slide the board into
the chassis until the ejector handle reaches the vertical bar.
8. Catch the hook onto the vertical bar of the chassis and push the ejector handle shut.
9. Lock the ejector handle onto the board.
Mellanox Technologies

Figure 29: Intact vs Defected Power Pin Holders

Pass
Do not apply excessive force to slide in the leaf board. If you feel resistance, remove
the leaf board and double check both the chassis and leaf for any damage.
Fail
40