Nailing Flange Assembly & Installation - kozy heat DASSEL DSL-36 Installation And Operation Manual

Direct vent dassel
Table of Contents

Advertisement

NAILING FLANGE ASSEMBLY & INSTALLATION
1.
Remove the (4) nailing flanges from fireplace sides.
2.
With the 1/4" (6 mm) stand-offs on the nailing flanges facing away from fireplace, align nailing flange with the holes on the
outside corners of fireplace . Secure with screws (provided in installation manual parts packet) through the slots in the nail-
ing flanges .
3.
Bend perforation on nailing flange until parallel with fireplace face. Do not bend toward fireplace face.
4.
Position framing stud against the 1/4" (6 mm) stand-off located on the backside of the nailing flange and secure with nails
or screws.
When installed, nailing flanges provide the minimum 1/4" (6 mm) clearance from fireplace sides.
NOTE: Depending on facing material, tabs can be adjusted forward or back up to 1/2" (13 mm).
CAUTION: NEVER PERMANENTLY REMOVE THESE ASSEMBLIES FROM THE FIREPLACE - THEY MUST BE SECURED
IN PLACE REGARDLESS OF FINISH MATERIAL USED.
PREPARE THE FIREPLACE
AS SHIPPED
NAILING FLANGES
INSTALLED
1/4" (6mm)
CLEARANCE
1/4" (6mm)
CLEARANCE
NAILING FLANGE
PAGE 11
FRONT VIEW
NAILING FLANGE
FRAMING STUD
TOP VIEW
STAND-OFF
FRAMING STUD

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dassel dsl-36-rf

Table of Contents