4.5.3 Through Roof Installation

1. Position stove following clearances given
in Section 3.2 Minimum Clearances to
and
Combustibles
manufacturer's instructions.
2. Install a cleanout tee to the stove
exhaust. If necessary, use a horizontal
additional length between the exhaust
and the tee. If you wish to center the
vertical part of the vent with the stove, a
45° elbow and a tee can be used to route
the pipe from the exhaust towards the
back center of the stove.
3. Drop the plumb bob over the center of
the tee outlet and mark location on the
ceiling. Install the ceiling support and the
vent
pipe
by
manufacturer's instructions.
4. Always
follow
clearances instructions from combustible
materials.
When
additional floors or ceilings, always install
a fire stop spacer.
5. After lining up for hole in roof, cut either a
round or square hole in roof. Install upper
edge and sides of flashing under roofing
materials. Nail it to the roof along upper
edge. Do not nail lower edge. Seal nail
heads with flexible waterproof sealant.
6. Apply
high
temperature
silicone sealant where the storm collar
meets the vent. Slide storm collar down
until it sits on the flashing.
7. Seal and install vertical roof vent. If
required, seal and install a storm collar.
Eurostar Installation and Operation Manual
following
vent
following
the
vent
vent
manufacturer's
passing
through
waterproof
19