Testing New Batteries; Replacing The Electronics Module - Eaton Powerware 9140 User Manual

7.5-10 kva ups
Hide thumbs Also See for Powerware 9140:
Table of Contents

Advertisement

Testing New Batteries

NOTE The batteries must be fully charged and the UPS must not be in Battery mode to
perform the battery test.
NOTE For an accurate battery test, test the UPS with at least 10% load applied to the UPS.
To test the new batteries:
1.
2.
3.

Replacing the Electronics Module

Consider all warnings and notes before replacing the electronics module.
The electronics module can be replaced easily without turning the UPS
off or disconnecting the load. The UPS automatically transfers to Bypass
mode. Battery mode is not available; however, the utility power
continues to be passively filtered by the UPS.
If you prefer to remove input power to change the electronics module,
see "UPS Shutdown" on page 66.
®
EATON Powerware
9140 UPS (7.5–10 kVA) User's Guide
Plug the UPS into a power outlet (apply utility power on hardwired
models) for 48 hours to charge the battery.
After charging the battery, select MENU from the system status
screen, then select CONTROL, BATTERY TEST, and
SCHEDULE TEST.
The UPS verifies the battery converter and schedules the battery
test to occur during the next appropriate stage in the charging cycle
(or immediately if possible).
During the battery test, the Battery LED (yellow) flashes rapidly.
To view a report of the latest scheduled battery test, select MENU
from the system status screen, then select CONTROL,
BATTERY TEST, and TEST REPORT.
S
164201622 Rev A FINAL DRAFT 14-Jul-2006
UPS MAINTENANCE
81