Honeywell EQUIP Series Installation And Configuration Manual page 29

Acuix ip digital high speed ptz dome
Hide thumbs Also See for EQUIP Series:
Table of Contents

Advertisement

Document 800-04194V1 Rev A
07/11
®
EQUIP
Series ACUIX™ IP PTZ Dome Installation and Configuration Guide
To install an in-ceiling housing in a hard ceiling:
1. Select the location where you want to install the housing and, using the
supplied template, cut a hole in the ceiling 7.64 in. (194 mm) in diameter.
2. If the ceiling is drywall or plaster, seal the perimeter of the hole with
adhesive tape or a plastic channel to prevent dust and debris from falling.
3. If required, install a safety cable to anchor the housing to a ceiling joist or
other structural member.
4. Route the field wiring through the access hole in the housing and through
the access hole in the housing interface board.
5. Install the supplied ferrite bead on the power cable as close to the housing
as possible, preferably within 24 in. (609 mm).
6. Stagger the housing wing tabs so that they are at different heights (see
Figure
2-7).
7. Push the wing tabs flat against the housing and insert the housing into the
ceiling.
8. Turn the wing tab screws clockwise to rotate the tabs out, and then tighten
the tabs against the ceiling. The recommended maximum torque is
0.74–0.92 ft·lb (1.0–1.25 N·m).
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acuix equip series

Table of Contents