NEC N8100- 1241F User Manual page 89

Express5800/120rg-1
Table of Contents

Advertisement

2.
At least two persons are required to install the server. Securely hold the server and install
it in the rack.
Firmly fit the inner rails on the sides of the server into the rail assemblies that are installed
on the rack, and then slowly push the server into the rack.
3.
If the server is locked on its way into the rack, slowly push it in while pressing the release
levers on the right and left sides of the server.
When the server is completely pushed into the rack, the server is locked.
Inner rail at server side
Release lever
Setting Up Your Server 3-21
Rail assembly

Advertisement

Table of Contents
loading

Table of Contents