NEC N8100- 1241F User Manual page 246

Express5800/120rg-1
Table of Contents

Advertisement

9-6 Upgrading Your Server
With N8100-1301F/1302F/1304F/1305F/1306F/1308F/1309F/1310F/1312F/
1313AF/1314AF
1.
See the section "Preparing for Installation and Removal" described earlier to prepare.
NOTE:
switch and the UID LED that goes on when the switch is pressed.
2.
Loosen the unlock buttons at the right and left sides of the front panel, and slowly pull out
the server from the rack.
The server is locked while you are pulling it. Stop pulling when it is locked.
To place the server in the rack, push it back into the rack while pushing the right and left release
levers forward or rearward.
IMPORTANT:
levers or rails.
To confirm the device you are going to maintain, use the UID
Press this button to
unlock the server
Be very careful not to get your finger caught in the
Release lever

Advertisement

Table of Contents
loading

Table of Contents