Installing A T4000 Routing Engine; Figure 124: Removing The Routing Engine Cover; Figure 125: Removing A T4000 C1800 Routing Engine - Juniper T4000 Hardware Manual

Hide thumbs Also See for T4000:
Table of Contents

Advertisement

T4000 Router Hardware Guide

Installing a T4000 Routing Engine

268

Figure 124: Removing the Routing Engine Cover

Figure 125: Removing a T4000 C1800 Routing Engine

To install a Routing Engine (see
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
1.
the strap to one of the ESD points on the chassis.
Ensure that the ejector handles are not in the locked position. If necessary, press the
2.
red tabs and flip the ejector handles outward.
Place one hand underneath the Routing Engine to support it. With the other hand,
3.
grasp one of the ejector handles on the faceplate.
Carefully align the sides of the Routing Engine with the guides inside the chassis.
4.
Slide the Routing Engine into the chassis until you feel resistance, then press the
5.
Routing Engine's faceplate until it engages the midplane connectors.
Press both the ejector handles inward to seat the Routing Engine.
6.
The Routing Engine might require several minutes to boot.
Figure 126 on page
269):
Copyright © 2013, Juniper Networks, Inc.

Advertisement

Table of Contents
loading

Table of Contents