Table 3-2 Server Dimensions and Values (continued)
Dimensions
Pedestal footprint
Rack units

Safety Information

Use care to prevent injury and equipment damage when performing removal and replacement
procedures. Voltages might be present within the server. Many assemblies are sensitive to damage
by electrostatic discharge.
Follow the safety conventions listed below to ensure safe handling of components, to prevent
injury, and to prevent damage to the server:
When removing or installing any server component, follow the instructions provided in this
guide.
If installing a hot-swappable or hot-pluggable component when power is applied (fans are
running), reinstall the server cover immediately to prevent overheating.
If installing a hot-pluggable component, complete the required software intervention before
removing the component.
If installing an assembly that is neither hot-swappable, nor hot-pluggable, disconnect the
power cable from the external server power receptacle.
WARNING!
from the server before removing or installing server hardware unless you are removing or
installing a hot-swappable or hot-pluggable component.
Voltages are present at various locations within the server whenever a DC power source is
connected. This voltage is present even when the main power switch is turned off.
Failure to observe this warning can result in personal injury or damage to equipment.
Do not wear loose clothing that can snag or catch on the server or on other items.
Do not wear clothing subject to static charge build up, such as wool or synthetic materials.
If installing an internal assembly, wear an antistatic wrist strap and use a grounding mat,
such as those included in the Electrically Conductive Field Service Grounding Kit (HP
9300-1609).
Handle accessory boards and components by the edges only. Do not touch any metal-edge
connectors or any electrical components on accessory boards.

Installation Sequence and Checklist

To ensure successful installation of the server, follow the steps in
Table 3-3 Installation Sequence Checklist
Step
Description
1
Unpack and inspect the server shipping container; inventory the contents using the
packing slip.
2
Install additional components shipped with the server.
3
Install the server into a rack- or pedestal-mount.
4
Connect cables to the server.
4a
Connect DC input power cable.
4b
Connect LAN core I/O cable.
50
Installing the System
Ensure that the server is powered off and all the power sources are disconnected
Values
2.1 sq ft (0.2 m2)
2U
Table 3-3
sequentially.
Completed