4.16.3 Installing the Harness Connectors
Attach the 12 harness connectors to the MAIN PCB. Do not attach the power harness
assy (red/ black CN13).
Power harness assembly
Yellow (CN12)
Yellow, blue, white, red, gray (CN11)
4.17 Covers
4.17.1 Reassembling the Dial Switch Holder Assy B
1.Put the dial lock arm on the dial S holder assy shaft. Engage lug A with the dial S
holder assy.
Lug A
Black (CN10)
White (CN9)
Fig. 4.16-5
Installing the Harness Connectors
Dial lock arm
Fig. 4.17-1
Reassembling the Dial Switch Holder Assy B (1)
4-33
Orange (CN15)
Blue (CN8)
White (CN7)
Red (CN6)
Black (CN5)
Flat cable
White (CN3)
Red (CN4)
Dial S holder assy