The purpose of the connectors and switches are as follows:
reset
This recessed button resets the MERLIN Attendant. See
"Troubleshooting" for details.
setup switches
There are four setup switches. Switches 1, 2, and 3 control the MERLIN
Attendant response to a power outage as shown in Table 1-2; switch 4
is not used.
Table 1-2
Switch
1
2
3
4
CAUTION:
After connecting ac power to the MERLIN Attendant, be sure that
switches 1 and 2 are on (down) and switches 3 and 4 are off (up). With
this setting, recorded announcements are saved up to three hours
during a power outage (assuming the battery is fully charged) and
routing plans and programming parameters are retained up to eight
weeks.

Meaning of Setup Switch Settings

On (Down)
Recorded announcements are
retained during a power outage
Routes and other programming
parameters are retained during a
power outage
The MERLIN Attendant
continues to answer calls during
a power outage
Not Used
Off (Up)
Recorded announcements are
erased during a power outage
Routes and other
programming parameters are
reset to defaults during a
power outage
The MERLIN Attendant does
not answer calls during a
power outage
Not Used