Notes
When the rectifiers are turned off, the battery current will supply all the current to the
1
load. At this time the battery current will equal the load current.
This test assumes there is a current sensor on the DC Load Bus. If batteries are not
installed on the system, connect the load bank to the battery bus.
If the battery current is determined by a summation, conduct the load current test before
the battery current test.
The test should be done at the maximum expected system load current.
2
This test assumes there is a current sensor on the DC load bus.
As the analog inputs can be configured for many different types of analog signal, tests
3
have not been detailed on this test sheet.
User assigned analog inputs are not available on all systems.
Copyright © 2005-2007 Eaton Corporation. All Rights Reserved.
IPN 997-00012-54A
July 2007
Commissioning
79

Advertisement

loading
Need help?

Need help?

Do you have a question about the Powerware 3G System SC200 and is the answer not in the manual?