Table of Contents

Advertisement

Access Power Solutions
Installation and Operation Guide
(APS3-300 Series)
Issue: IPN 997-00012-48D
Issue Date: November 2012
Refer to the separate SC200 or SC100 system controller handbook for full
details of the system controller operation -
dcpower.eaton.com/Manuals.asp
Eaton Corporation
Telecommunications Power Solutions
dcpower.eaton.com
DCinfo@eaton.com

Advertisement

Table of Contents
loading

Summary of Contents for Eaton APS3-300

  • Page 1 Access Power Solutions Installation and Operation Guide (APS3-300 Series) Issue: IPN 997-00012-48D Issue Date: November 2012 Refer to the separate SC200 or SC100 system controller handbook for full details of the system controller operation - dcpower.eaton.com/Manuals.asp Eaton Corporation Telecommunications Power Solutions dcpower.eaton.com...
  • Page 2 The information contained in this literature is subject to change without notice. Subject to the right to use its equipment, Eaton Corporation does not convey any right, title or interest in its intellectual property, including, without limitation, its patents, copyrights and know-how.
  • Page 3: About This Guide

    About T his Gui de Scope This guide covers installation, operation and maintenance of Access Power Solutions (APS3-300 Series) dc power systems (APS), controlled by the SC200 or SC100 system controller. Refer to the separate SC200 or SC100 system controller handbook for full details of the system controller operation - dcpower.eaton.com/Manuals.asp.
  • Page 4 Access Power Solutions Installation and Operation Guide (APS3-300 Series) Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 5: Table Of Contents

    Task 3 - Applying AC Power ....................35 Task 4 - Configuring the DC Power System ............... 36 Task 5 - Applying DC Power to Battery and Load ............37 Start-Up Completed ....................... 38 Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 6 Access Power Solutions Installation and Operation Guide (APS3-300 Series) Chapter 5 System Controller Configuration File ........................40 Backup and Restore ........................40 Starting the SC200 or SC100 ....................41 SC200 ............................... 41 SC100 ............................... 41 SC200 or SC100 Operation using the Keypad and Screen ..........42 Keypad Access Security ........................
  • Page 7: Overview

    Chapter 1 General Description Gener al D escription Overview Topic Page Access Power Solutions DC Power Systems Rectifiers System Controller Input/Output Board Other Features Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 8: Access Power Solutions Dc Power Systems

    Access Power Solutions Installation and Operation Guide (APS3-300 Series) Access Power Solutions DC Power Systems Front View   System labels DC distribution cover   Rectifier modules (see details on page 4) DC common bus battery terminals  ...
  • Page 9: Rear View

    Load and battery cable tie rod connection details on page 22)  I/O Board (see details on page 7)  AC cable entry gland  AC supply cord(s) may be pre-fitted. Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 10: Rectifiers

    Access Power Solutions Installation and Operation Guide (APS3-300 Series) Rectifiers Access Power Solutions are fitted with either 48V, 2000W (APR48-ES); 48V, 1800W (APR48-3G); 48V, 900W (EPR48-3G) or 24V, 1440W (APR24-3G) rectifiers. The rectifiers are fan-cooled and hot-pluggable.  See Specifications on page for further information.
  • Page 11: System Controller

    Soft keys (2)  Navigation keys (4)  USB 1.1 connector (12Mb/s)  Retaining screw  Power and system communications connector  RS232 connector  Ethernet connector and status LEDs Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 12: Sc100 System Controller

    DCTools Configuration Software. Latest version is available free from dcpower.eaton.com/downloads. PowerManagerII Remote Control and Monitoring Software. Contact your Eaton dc product supplier for further information (see Worldwide Support on page 101). Recommended web browsers (SC200 only): Microsoft Internet Explorer 8 or later (IE6 is compatible but with reduced performance), Mozilla Firefox 3.0 or later.
  • Page 13: Input/Output Board

    Load Fuse Fail, Battery Fuse Fail, AC Distribution Fan Fail, AC Distribution MOV Fail) - YH3  See Troubleshooting on page for details of I/O board LED signals. Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 14: Connections

    Access Power Solutions Installation and Operation Guide (APS3-300 Series) Connections The following diagram shows the connections between the SC200 or SC100, the I/O board, the other dc power system components and external devices.   SC200 or SC100 system controller Connection to dc live bus ...
  • Page 15: Other Features

    (on an IOBGP I/O board) Low Voltage Disconnect Option An optional Low Voltage Disconnect (LVD) is available for the Access Power Solutions (APS3-300 Series). See the diagram on page for location. This is connected as a battery disconnect.
  • Page 16: Battery Time Remaining

    Access Power Solutions Installation and Operation Guide (APS3-300 Series) Battery Time Remaining The SC200 or SC100 obtains characterization data from either periodic battery discharges (SC100) or every full battery discharge (SC200), to a specified end voltage. During a battery discharge, the SC200 or SC100 uses this characterization data to calculate an estimated time until the battery will reach the specified end voltage.
  • Page 17: Preparation

    Chapter 2 Preparation Prepar ation Overview Topic Page Warnings Inspecting the Equipment and Reporting Damage Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 18: Warnings

     Electrical Safety Access Power Solutions (APS3-300 Series) dc power systems must be mounted in an enclosed cabinet that meets safety and fire enclosure requirements as specified in AS/NZS 60950.1 and EN 60950-1. The dc power system may be powered from multiple ac sources. All ac sources must be isolated before internally servicing the equipment.
  • Page 19  Batteries The plastic cases of batteries installed in Eaton dc power system racks must have a flammability rating of UL 94-V2 or better. Flooded cell and VRLA lead acid batteries can emit explosive gases and must be installed with adequate ventilation.
  • Page 20: Inspecting The Equipment And Reporting Damage

    Servicing. Servicing must only be performed according to specific instructions and only by personnel authorized by Eaton. This includes disassembly and/or servicing of any modules. For further information on Servicing contact your local Eaton dc product supplier, or refer to the contact details on page 101.
  • Page 21: Installation

    Task 8 - Connect External Input/Output Cabling (if required) Task 9 - Connect Additional Input/Output (if required - SC200 only) Task 10 - Connect to the AC Supply Point Installation Completed Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 22: Installation Tasks

    Access Power Solutions Installation and Operation Guide (APS3-300 Series) Installation Tasks Before starting the installation, review the following information: Required Equipment and Tools on page Warnings and Cautions on page Inspecting the Equipment and Reporting Damage on page Complete the Installation tasks in the following order:...
  • Page 23 If necessary, install higher rated RCD(s).  The maximum earth leakage current of Access Power Rectifiers is given in the Specifications on page 69. Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 24 If necessary, replace the upstream ac supply-disconnect device to achieve adequate discrimination. Or, contact your Eaton dc product supplier for advice (see Worldwide Support on page 101). Copyright © 2007-2012 Eaton Corporation. All Rights Reserved.
  • Page 25: Task 2 - Prepare Aps

    If the polarity of the APS is not correct for the equipment to be powered then contact your Eaton dc product supplier for advice (see Worldwide Support on page 101). Step 3 - Check position of mounting brackets APSs are pre-assembled with 19-inch rack-mounting brackets as shown in the following diagram.
  • Page 26 Access Power Solutions Installation and Operation Guide (APS3-300 Series)   Rack-mounting bracket (available for 19-inch Alternative bracket mounting positions and 23-inch wide racks) Step 4 - Install Load circuit breakers (if required) Ignore this Step if the load MCBs are already fitted.
  • Page 27 If the arrangement of the ac and dc earths is as required, no further action is required. If the arrangement of the ac and dc earths is not as required, follow the procedure in Earth Bonding on page 85. Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 28: Task 3 - Connect The Ac Supply Cable

    Access Power Solutions Installation and Operation Guide (APS3-300 Series)  Busbar chassis screw  Busbar  Busbar stand-off screw  Stand-off  DC common bar Procedure complete Task 3 - Connect the AC Supply Cable If the APS has pre-fitted ac cord(s) then ignore this task.
  • Page 29 Ensure the ferrule of the crimp lug covers all strands of wire. Connect the earth conductor to the earth termination point next to the ac terminals (see the diagram on page 3). Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 30 Access Power Solutions Installation and Operation Guide (APS3-300 Series) Step 6 - Terminate the phase and neutral (if used) conductor(s) at APS If ac MCB(s) fitted then connect the phase conductor(s) to the MCB(s).  Ensure the insulating card covers the MCB terminal(s).
  • Page 31: Task 4 - Mount The Aps In The Rack

    Recommended for access to cable terminations. Step 2 - Fit cage nuts Fit cage nuts in the correct positions to match the screw holes in the APS rack mounting brackets. Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 32: Task 5 - Connect The Dc Load And Battery Cables

    Access Power Solutions Installation and Operation Guide (APS3-300 Series) Step 3 - Mount the APS Carefully feed the ac supply cable or cord(s) into the rack. Lift the APS to the correct position in the rack.  A suitable mechanical support or a second person must support the weight of the APS.
  • Page 33: Task 6 - Install The Batteries

    Always check that the battery cables have been terminated to the correct system polarity  BEFORE connecting the batteries or closing the battery disconnect device. Connecting batteries to the system with incorrect system polarity will void all warranty claims. Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 34  The Mid-point Monitoring sense wires must have short-circuit protection fitted close to the battery terminals. Use the Battery Mid-point Monitoring kits from Eaton (see Spare Parts on page 66) or equivalent. Connect a Mid-point Monitoring sense wire to the middle interconnecting link on each string of batteries (see following diagram).
  • Page 35: Task 7 - Mount The Battery Temperature Sensor

    Do not attach the sensor to a battery case, battery cables, terminals or interconnecting bars. Do not expose the sensor to direct sunlight, or air movements from air-conditioning systems or open windows. Procedure complete Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 36: Task 8 - Connect External Input/Output Cabling (If Required)

    Access Power Solutions Installation and Operation Guide (APS3-300 Series) Task 8 - Connect External Input/Output Cabling (if required) Refer to Input/Output Board on page for details of how the I/O board can control and monitor external devices. If no external devices are to be connected then ignore this task.
  • Page 37: Task 9 - Connect Additional Input/Output (If Required - Sc200 Only)

     Connect the SiteSure-3G cable to a spare RJ45 socket (S1, S2 or S3) on the Voltage Feed Module board. See the diagram on page for socket location. Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 38: Task 10 - Connect To The Ac Supply Point

    Access Power Solutions Installation and Operation Guide (APS3-300 Series) Task 10 - Connect to the AC Supply Point A suitably qualified electrician familiar with local wiring regulations must carry out the ac  connection. Step 1 - Replace all covers on the APS Step 2 - Connect at the ac supply point Check the ac supply point is isolated.
  • Page 39: Overview

    Task 2 - Pre-Power-Up Checklist Task 3 - Applying AC Power Task 4 - Configuring the DC Power System Task 5 - Applying DC Power to Battery and Load Start-Up Completed Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 40: Start-Up Tasks

    Access Power Solutions Installation and Operation Guide (APS3-300 Series) Start-Up Tasks Complete all the Installation tasks (see details on page 16) before starting these Start-Up tasks. Complete the Start-Up tasks in the following order: Task Description Reference Insert the Rectifiers...
  • Page 41: Task 2 - Pre-Power-Up Checklist

    The SC200 or SC100 system controller will turn on (green Power On LED is on) when the rectifiers start. During start-up of the system controller the rectifier yellow alarm LEDs will flash until the rectifiers are registered. Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 42: Task 4 - Configuring The Dc Power System

    Access Power Solutions Installation and Operation Guide (APS3-300 Series) After start-up of the system controller: Press any key on the system controller to silence the alarm.  Depending on the configuration file settings, one or both alarm LED(s) may be on and the system controller may display some system alarm messages.
  • Page 43: Task 5 - Applying Dc Power To Battery And Load

    Step 3 - Connect load Switch on the Load MCB(s) and/or fit the Load fuses. Check the equipment powers up and the Load Fuse Fail alarm clears. Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 44: Start-Up Completed

    Access Power Solutions Installation and Operation Guide (APS3-300 Series) Step 4 - Check the rectifier currents Check the rectifier currents. Verify the load current is as expected for the load and battery size and does not exceed the maximum load rating (see details on page 69).
  • Page 45 Configuration File Starting the SC200 or SC100 SC200 or SC100 Operation using the Keypad and Screen SC200 or SC100 Operation Using a PC/Laptop SC200 or SC100 Identity Information Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 46: Configuration File

    Access Power Solutions Installation and Operation Guide (APS3-300 Series) Configuration File The operational settings of the dc power system are stored in a configuration file loaded into the SC200 or SC100 system controller. The SC200 or SC100 is supplied pre-loaded with a configuration file. If this configuration file has been customized for the site then no further configuration changes will be necessary.
  • Page 47: Starting The Sc200 Or Sc100

    Handbook. All active Critical, Major, Minor and Warning alarms are displayed. SC100  Approx Start-up screen First status screen Main menu All active alarms are displayed. See details on page 76. Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 48: Sc200 Or Sc100 Operation Using The Keypad And Screen

    Keypad access is Read Only, or PIN Protected and the keypad access PIN is lost. The SC200 will continue to function, but no configuration changes can be made. Contact your Eaton dc product supplier or Eaton for advice (see Worldwide Support on page 101).
  • Page 49: Alarm Indicators

    Critical/Major alarms always override Minor alarms. ► To stop the audible indicator Press any key  The audible indicator will restart at the next active alarm or alert message. Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 50: Sc200 Or Sc100 Operation Using A Pc/Laptop

    SC200 or SC100 Operation Using a PC/Laptop DCTools is configuration software for editing a system controller's configuration file (on-line) and monitoring the operation of Eaton's dc power systems. It is available free from dcpower.eaton.com/downloads. Using DCTools via USB (SC200 only) DCTools can be run on a PC/laptop connected to the SC200's USB port.
  • Page 51 System Controller ► To connect a PC/laptop to the SC200 or SC100: Download the latest version of DCTools from: dcpower.eaton.com/downloads. Install DCTools on the PC/laptop. Connect a null-modem cable from the COM1 RS232 port on the PC/laptop to the RS232 connector on the SC200 or SC100.
  • Page 52: Sc200 Or Sc100 Identity Information

    Access Power Solutions Installation and Operation Guide (APS3-300 Series) SC200 or SC100 Identity Information The following identity information is stored in the SC200 or SC100. Parameter Description Where to find: Serial Number The SC200 or SC100 serial number SC100: Menu > Identity >SC100 (factory set).
  • Page 53: Maintenance

    Servicing. Servicing must only be performed according to specific instructions and only by personnel authorized by Eaton. This includes disassembly and/or servicing of any modules. For further information on Servicing contact your local Eaton dc product supplier, or refer to the contact details on page 101. Topic...
  • Page 54: Troubleshooting

    Access Power Solutions Installation and Operation Guide (APS3-300 Series) Troubleshooting Use the table to troubleshoot minor installation and operational problems. For additional assistance see contact details on page 101. Return items for replacement or repair with a completed Equipment Incident Report on page 99.
  • Page 55 Install additional rectifiers. and rectifier yellow LEDs capacity. are on (rectifiers are in Battery is recharging after ac Check battery has recharged within current limit). supply failure. expected time. Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 56 Access Power Solutions Installation and Operation Guide (APS3-300 Series) Problem Possible Cause Required Action High system output voltage. Temperature Compensation is None. This is normal operation (if active and the battery batteries are connected). Disable temperature is below the Temperature Compensation if no reference temperature.
  • Page 57: System Controller Problems

    Incorrectly configured shunt Check shunt mapping and gain is correct. inputs. Current is within the Battery None, normal operation. State Threshold. See details in the System Controller Operation Handbook. Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 58 Access Power Solutions Installation and Operation Guide (APS3-300 Series) Problem Possible Cause Required Action SC200 or SC100 or Failed, disconnected or Replace, connect or configure sensor. DCTools/Web displays ??? unconfigured sensor. or N/A Faulty or disconnected voltage Replace or connect voltage feed module.
  • Page 59 Check S3P Access is enabled. See details are disabled. in the System Controller Operation Handbook. Password required to change See Write Access Password in the System settings (using DCTools or Controller Operation Handbook. PowerManagerII). Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 60 Access Power Solutions Installation and Operation Guide (APS3-300 Series) Problem Possible Cause Required Action Web communications Ethernet communications See previous entry. problem (SC200 only) problem. Cannot connect to web server. Check IP address and other settings in SC200 are correct. Check correct IP address is used in web browser address bar.
  • Page 61 See details in the System Controller Operation Handbook (SC200 only). Contactor is disconnected. Check the control and dc power cables are connected. See details on page 8. Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 62: Replacing Or Adding A Rectifier

    Access Power Solutions Installation and Operation Guide (APS3-300 Series) Replacing or Adding a Rectifier Rectifiers can be replaced without switching off the dc power system and disconnecting the equipment it powers. To reduce the risk of electric shock and maintain optimum system cooling, always cover ...
  • Page 63: Replacing Or Adding A Load Mcb

    Disconnect the load cable and the fuse fail detect wire from the MCB top terminal. Insulate the ends of both the cable and the wire. Undo the bottom MCB terminal. Unclip the MCB from the DIN rail and remove the MCB. Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 64: Replacing The System Controller

    Eaton dc power system supplier to obtain a master configuration file to suit the dc power system. This file will have to be customized for the site.
  • Page 65 DCTools/Web to change the configuration settings to the correct values (provided the system controller is set for the correct nominal system voltage). Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 66 Access Power Solutions Installation and Operation Guide (APS3-300 Series) Step 5 - Check the system controller operation Map the I/O board (SC200 only): In DCTools/Web go to: RXP. Copy the I/O board serial number(s) from the RXP Devices table to the I/O Board to Serial Number Mapping table to map an IOB Number to each I/O board (overwrite an existing serial number if required).
  • Page 67: Replacing The Input/Output Board

    Label then disconnect all the input/output wires connected to the push-connect terminals (XH15 - XH21). Place the board in an anti-static bag and return for service. See Equipment Incident Report on page 99. Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 68 Access Power Solutions Installation and Operation Guide (APS3-300 Series) Step 4 - Fit the new I/O board Reconnect all the input/output wires to the push-connect terminals (XH15 - XH21). Fit the I/O board on to the support posts in the APS.
  • Page 69: Battery Mid-Point Monitoring (String Fail) Alarm (Sc200 Only)

    Please remember that the owner is responsible and liable to ensure those EPA guidelines or equivalent local regulations are followed. For assistance contact your local hazardous waste facility or Worldwide Support on page 101. Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 70 Access Power Solutions Installation and Operation Guide (APS3-300 Series) Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 71: Appendix A Equipment And Tools

    USB port (for use with SC200) or RS232 port (for use with SC100) DCTools software (download from dcpower.eaton.com/downloads). Test load (to suit maximum output of dc power system) Labeling tool and labels Clamp-on ammeter Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 72: Spare Parts

    Access Power Solutions Installation and Operation Guide (APS3-300 Series) Spare Parts Item Description Part Number Rectifier. 48V, 2000W: Eaton APR48-ES See replacement procedure on page 56. 48V, 1800W: Eaton APR48-3G 48V, 900W: Eaton EPR48-3G 24V, 1440W: Eaton APR24-3G Rectifier blank panel...
  • Page 73: Standard Torque Settings

    When a bolt and nut is torqued use a spanner to prevent rotation. Use hand tools when loosening and tightening stainless steel fasteners. Lubricate bolts before tightening to prevent them locking up. Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 74 Access Power Solutions Installation and Operation Guide (APS3-300 Series) Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 75: Appendix B Specifications

    APR48-3G rectifiers: 5.4kW* APR48-ES rectifiers: 6.0kW* Load Current (maximum) 133A Output Voltage Range 21.5 - 32V / 43 - 57.5V * subject to the maximum load current as specified Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 76 Access Power Solutions Installation and Operation Guide (APS3-300 Series) Rectifiers Operating Ranges APR24-3G/APR48-3G/EPR48-3G: Rated: 175 – 275V Full output up to 50°C [122°F] Extended: 90 – 300V Reduced output power below 175V APR48-ES: Rated: 185 – 275V Full output up to 50°C [122°F] Extended: 90 –...
  • Page 77 24 (with additional IOBGP-01 I/O boards) Range –35V to +35V Resolution <30mV Accuracy ±0.5% at 25°C [77°F], ±1% over rated temperature range Maximum Cable Length 20m (65 feet) Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 78 Access Power Solutions Installation and Operation Guide (APS3-300 Series) Low Voltage Disconnect (IOBGP) Number of contactor connections 2 per IOBGP I/O board Number of LVD channels SC100 systems: 2, SC200 systems: 16 Contactor Type Normally Open (NO) or Normally Closed (NC)*, with or without auxiliary contacts.
  • Page 79: Appendix C Cable Ratings

    Chint, DZ158-125 Series, 100A, Curve 35mm / 1AWG 307-912519-61 Chint, DZ158-125 Series, 125A, Curve 50mm / 0AWG * or local equivalent. Please contact your local Eaton sales office. Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 80 Access Power Solutions Installation and Operation Guide (APS3-300 Series) Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 81: Appendix D Controller Menus

    At each menu screen press Enter to access the associated configuration menu screen(s). These menus have multiple configuration menu screens. See details in the System Controller Operation Handbook. Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 82: Sc100 Menu

    Access Power Solutions Installation and Operation Guide (APS3-300 Series) SC100 Menu The following diagram shows the Status Screens and main navigation.  See Analog System Values for details of the values displayed.   Any active alarms are displayed in rotation.
  • Page 83: Appendix E Connector Pin-Outs

    RXP System +24/48V (System bus voltage) Communications +24/48V (System bus voltage) RS485-A RS485-B USB B USB Serial Interface VCC (+5 V dc) (SC200 only) Data - Data + Ground Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 84: I/O Board (Iobgp-00, -01) Connector Pin-Outs

    Access Power Solutions Installation and Operation Guide (APS3-300 Series) RS232 D9M and RJ45 connector pin-outs RJ45 plug pin-outs I/O Board (IOBGP-00, -01) Connector Pin-outs See input and output specifications on page 69. Connector Type Purpose Description LVD 1 Interface Coil -...
  • Page 85 Digital relay outputs 5-6* Relay 5 normally closed (NC) Relay 5 normally open (NO) Relay 5 Common (COM) Relay 6 normally closed (NC) Relay 6 normally open (NO) Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 86 Access Power Solutions Installation and Operation Guide (APS3-300 Series) Connector Type Purpose Description Relay 6 Common (COM) RJ45 DC power system digital Load Fuse Fail inputs Battery Fuse Fail +12V out AC Distribution Fan Fail AC Distribution MOV Fail 0V out (system live - protected)
  • Page 87: Appendix F Transient Protection

    Appendix F Transient Protection Transi ent Protecti on To prevent damage to Eaton Access Power Solutions from lightning and transient over-voltages, structural lightning protection and transient protection must be installed at each site. Transient protection will also protect against other sources of transients, such as:...
  • Page 88 Access Power Solutions Installation and Operation Guide (APS3-300 Series) Primary Transient Protection Primary transient protection must be considered at all sites. Eaton recommends primary transient protection on the incoming ac supply either at the main ac switchboard or sub-switchboard. In the absence of sufficient information, primary transient protective devices with a minimum repeat strike rating of 100kA (8/20μs wave shape) are recommended.
  • Page 89 2kA. Tertiary Transient Protection Eaton rectifiers are fitted with 6kV/3kA transient protection. This is designed to protect the rectifiers from voltage spikes generated during operation of the upstream transient protection system. Do not install rectifiers without adequate upstream surge protection.
  • Page 90 Access Power Solutions Installation and Operation Guide (APS3-300 Series) Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 91: Appendix G Earth Bonding

    21). This link prevents these very large voltages from developing and protects the rectifiers from surge related damage. If your installation uses a mesh earth, then Eaton recommends that this factory fitted ac-dc earth link is retained. No further action is required.
  • Page 92 Access Power Solutions Installation and Operation Guide (APS3-300 Series) Step 2 - Remove or replace the ac-dc Earth Link Ignore this Step if the factory fitted ac-dc earth link is used. There are two options if the ac-dc earth link cannot be retained. Either:...
  • Page 93 See details on page System Controls See details on page System Alarms See details on page Digital Inputs See details on page Digital Outputs (Relays) See details on page Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 94: Analog Inputs

    Access Power Solutions Installation and Operation Guide (APS3-300 Series) Analog Inputs Equipment required: Digital Voltmeter DC Load bank DC Current Clamp meter Trim pot adjustment tool Thermometer Test Test procedure Adjustment Measure the dc voltage across the dc bus. DC Voltage...
  • Page 95 As the analog inputs can be configured for many different types of analog signal, tests have not been detailed on this test sheet. User assigned analog inputs are not available on all systems. Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 96: System Controls

    Access Power Solutions Installation and Operation Guide (APS3-300 Series) System Controls Equipment Required: DC Load bank Test Test procedure Adjustment Apply a load to the power system. Voltage Control None With DCTools, ensure the bus voltage matches the Target Note 1 Voltage as shown on the Voltage Control Summary of DCTools.
  • Page 97 Set the LVD manual control to AUTO. Ensure the LVD connects. Ensure the SC200 or SC100 shows no LVD alarms. Ensure the I/O board LVD LED is on. Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 98 Access Power Solutions Installation and Operation Guide (APS3-300 Series) Test Test procedure Adjustment Check the LVD contactor is connected. Low Voltage None Disconnect – Increase the LVD Disconnect Voltage Threshold. Automatic Reduce the system voltage below the LVD Disconnect Operation Voltage Threshold.
  • Page 99: System Alarms

    Turn off the ac MCBs to 2 rectifiers (if fitted). Multiple rectifier fail The rectifiers will turn off. Ensure alarm operates. Remove a rectifier from the system. Rectifier comms lost Ensure alarm operates. Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 100 Access Power Solutions Installation and Operation Guide (APS3-300 Series) Test Test procedure Adjustment Remove 2 rectifiers from the system. Multiple Rectifier comms lost Ensure alarm operates. Turn off the ac to more than 20% of the rectifiers in the Partial AC Fail system.
  • Page 101 Change the AC Frequency Threshold. Note 6 Ensure alarm operates. Change the state of the digital input with Engine Run Engine Run Option function. Note 7 Ensure alarm operates. Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 102: Digital Inputs

    Access Power Solutions Installation and Operation Guide (APS3-300 Series) Notes Ensure Alarm Tracking is disabled. Ensure Temperature Compensation is enabled. If the load is not connected to the load MCBs and if an electronic Fuse Fail detect circuits is installed, this test can also be performed as follows: Turn off the load MCB Connect a high impedance path >100k ) between the end load side of the MCB and the...
  • Page 103: Digital Outputs (Relays)

    Commissioning Completed Restore the original (backed-up prior to the testing) configuration file. Use DCTools/Web to change any configuration file settings that were noted as incorrect during the Commissioning tests. Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 104: Ipn 997-00012-48D November

    Access Power Solutions Installation and Operation Guide (APS3-300 Series) Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 105: Equipment Incident Report

    Please enter as much information as you can. Send the completed form, together with the item for repair to your nearest authorized service agent. NOTE: Only one fault to be recorded per form. For further information contact your local Eaton dc product supplier or Eaton (see contact details on page 101). Or email: CustomerServiceNZ@eaton.com...
  • Page 106 ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ SG/03 ISS06 Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 107: Worldwide Support

    Worldwide Support Worldwide Support For product information and a complete listing of worldwide sales offices, visit Eaton's website at: dcpower.eaton.com or email: DCinfo@eaton.com For technical support contact either your local Eaton dc product representative, the closest office from the following list, telephone (+64) 3-343-7448, or email CustomerServiceNZ@eaton.com...
  • Page 108 Access Power Solutions Installation and Operation Guide (APS3-300 Series) Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 109: Index

    Backup and Restore • 40 Battery Charging • 37 Connection to AC Supply • 22, 32, 35 Battery Current • 51 Current Battery Fuses • 50 Battery Current • 51 Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 110 Access Power Solutions Installation and Operation Guide (APS3-300 Series) Load Current • 51 Rectifier Current • 41 Identity Information • 46 Current Sense • 7, 8, 71 Input/Output (I/O) Board Connections to other system components • 8 Connector Pin-outs • 78 Damage (transport) •...
  • Page 111 Output Voltage and Current • 69 Write Access Password • 53 Problems • See Troubleshooting Servicing • 14, 99, 101 Rectifier Alarms • 4, 35 SiteSure-3G I/O module Rectifier blank panel • 56 Copyright © 2007-2012 Eaton Corporation. All Rights Reserved. IPN 997-00012-48D November 2012...
  • Page 112 Access Power Solutions Installation and Operation Guide (APS3-300 Series) Connection to APS • 2, 31 SMS Text Messaging • See GSM Modem Communications Browsers (recommended) • 6 SNMP • 9 Web Access Security • 54 SNTP • See Internal Clock Web Server •...

This manual is also suitable for:

Aps3-300 seriesSc200Sc100

Table of Contents