4
About This Guide
Purpose
This guide provides instructions to correctly install, commission and operate Powerware
Data-Voice-Video Power Solutions (3G Systems with SC200).
Audience
This guide is intended for use by:
DC power system installers competent in:
•
installing and commissioning DC Power Systems
•
safe working practices for AC and DC powered equipment
•
the relevant local electrical safety regulations and wiring standards
•
DC power system operators and maintenance staff competent in:
•
operation of DC Power Systems
•
safe working practices for AC and DC powered equipment
•
Scope
This guide covers installation, commissioning and maintenance of Powerware Data-Voice-
Video Power Solutions.
It does not cover:
System controller operations; installation of external alarm and user digital inputs
•
cabling; or setup of communications options or software. For details refer to the system
controller operation handbook listed under Related Information on page i.
Installation and configuration of Powerware SiteSure and CellSure modules. For details,
•
refer to the relevant guide listed under Related Information on page i.
Related Information
PowerManagerII Online Help
•
DCTools Online Help
•
SC200 System Controller Operation Handbook – IPN 997-00012-50
•
SiteSure-3G Installation and Operation Guide – IPN 997-00012-51
•
CellSure Installation Guide – IPN 997-00012-20
•
Copyright © 2005-2007 Eaton Corporation. All Rights Reserved.
IPN 997-00012-54A
About This Guide
July 2007
i
Need help?
Do you have a question about the Powerware 3G System SC200 and is the answer not in the manual?