Download Print this page

About This Guide; Purpose; Audience; Scope - Eaton Powerware 3G System SC200 Installation And Operation Manual

Data-voice-video power solutions
Hide thumbs Also See for Powerware 3G System SC200:

Advertisement

4

About This Guide

Purpose

This guide provides instructions to correctly install, commission and operate Powerware
Data-Voice-Video Power Solutions (3G Systems with SC200).

Audience

This guide is intended for use by:
DC power system installers competent in:
installing and commissioning DC Power Systems
safe working practices for AC and DC powered equipment
the relevant local electrical safety regulations and wiring standards
DC power system operators and maintenance staff competent in:
operation of DC Power Systems
safe working practices for AC and DC powered equipment

Scope

This guide covers installation, commissioning and maintenance of Powerware Data-Voice-
Video Power Solutions.
It does not cover:
System controller operations; installation of external alarm and user digital inputs
cabling; or setup of communications options or software. For details refer to the system
controller operation handbook listed under Related Information on page i.
Installation and configuration of Powerware SiteSure and CellSure modules. For details,
refer to the relevant guide listed under Related Information on page i.

Related Information

PowerManagerII Online Help
DCTools Online Help
SC200 System Controller Operation Handbook – IPN 997-00012-50
SiteSure-3G Installation and Operation Guide – IPN 997-00012-51
CellSure Installation Guide – IPN 997-00012-20
Copyright © 2005-2007 Eaton Corporation. All Rights Reserved.
IPN 997-00012-54A
About This Guide
July 2007
i

Advertisement

loading
Need help?

Need help?

Do you have a question about the Powerware 3G System SC200 and is the answer not in the manual?