Removing the Controller from the DIN track (when using only one Controller)
42
Mounting and Connecting Devices
1
2
5
Slide the Controller on the right
side towards the Controller Link
Unit so that it fits into the
Controller Link Unit.
Note
The mounting method is the same
even when two Controllers are gang-
mounted onto the Data Storage Unit.
Mount in the following order: Data
Storage Unit → 1st Controller → 2nd
Controller.
Important
Attach the end plates on both sides of
the Controller.
1
Pull the hook on the I/O cable end
of the Controller downwards.
2
Lift up the Controller from the I/O
cable end, and remove it from the
DIN track.
End plate
DIN track (sold separately)
PFP-100N (1m)
PFP-50N (0.5m)
PFP-100N2 (1m)
ZG2 User's Manual