Section 5 System: Service; General Maintenance; Maintenance Schedule - ESAB CUTMASTER 50+ Operating Manual

Plasma cutting system
Table of Contents

Advertisement

5.01

General Maintenance

Warning!
Disconnect input power before maintaining.
Visually inspect the torch body,
consumables and Quick Connect
Replace all
broken parts
5.02

Maintenance Schedule

NOTE!
The actual frequency of maintenance may need to be adjusted according to the operating environment.
Daily Operational Checks or Every Six Cutting Hours:
1.
Check torch consumable parts, replace if damaged or worn.
2.
Check plasma and secondary supply and pressure/flow.
Weekly or Every 30 Cutting Hours:
1.
Check fan for proper operation and adequate air flow.
2.
Inspect torch for any cracks or exposed wires, replace if necessary.
3.
Inspect input power cable for damage or exposed wires, replace if necessary.
0700 402 229

SECTION 5 SYSTEM: SERVICE

Each Use
Visual check of
torch tip and electrode
Weekly
Visually inspect the
cables and leads.
Replace as needed
3 Months
SERVICE
CUTMASTER 50+, CUTMASTER 70+
Maintain more often
if used under severe
conditions
Clean
exterior
of power supply
61

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cutmaster 70+

Table of Contents