Section 5 System: Service; General Maintenance; Maintenance Schedule - ESAB CUTMASTER 40 Operating Manual

Plasma cutting system
Hide thumbs Also See for CUTMASTER 40:
Table of Contents

Advertisement

5.01

General Maintenance

Warning!
Disconnect input power before maintaining.
Visually inspect the torch body,
consumables and Quick Connect
Replace all
broken parts
Art# A-14037
5.02

Maintenance Schedule

NOTE!
The actual frequency of maintenance may need to be adjusted according to the operating environment.
Daily Operational Checks or Every Six Cutting Hours:
1.
Check torch consumable parts, replace if damaged or worn.
2.
Check plasma and secondary supply and pressure/flow.
Weekly or Every 30 Cutting Hours:
1.
Check fan for proper operation and adequate air flow.
2.
Inspect torch for any cracks or exposed wires, replace if necessary.
3.
Inspect input power cable for damage or exposed wires, replace if necessary.
0-5570

SECTION 5 SYSTEM: SERVICE

Each Use
Visual check of
torch tip and electrode
Weekly
Visually inspect the
cables and leads.
Replace as needed
3 Months
SERVICE
CUTMASTER 40
Maintain more often
if used under severe
conditions
Clean
exterior
of power supply
39

Advertisement

Table of Contents
loading

Table of Contents