Required Tools For Installation; Required Parts For Installation - ABB Terra HP Generation 3 Installation Manual

Ul 175 kw static dc system
Hide thumbs Also See for Terra HP Generation 3:
Table of Contents

Advertisement

Technical data
Parameter
Eye bolts to hoist the charge post
Caps to replace the eye bolts after trans-
port of the charge post
12.3

Required tools for installation

Parameter
Hoisting equipment or forklift truck
Swivel eye bolts or bolts with lifting
loops (to use with hoisting equipment)
As a standard, eye bolts are installed on
the cabinets. Refer to section 12.2.
Bolts
Hex keys
Open spanners
Torque socket wrench
Screwdriver, cross
Wire cutter
Wire stripper pliers
Crimp pliers
12.4

Required parts for installation

Part
Fasteners and washers, to connect the
charge post to the foundation
Fasteners and washers, to connect the
power cabinet to the foundation
Fasteners and washers, for the earthing
connections
1
In the case of a metal foundation, the fasteners and washers are different, but included in the
delivery.
68
Note: It is possible that more parts are required in the delivery. Refer to
the order.
Specification
M10, 45 mm (1 3/8 in)
To fit in the holes for the eye bolts
Specification
Capable to lift the EVSE safely. Take into
account the dimensions, the mass, and
the center of gravity.
Thread M10 for the charge post
Thread M16 for the power cabinet
Size M16
Standard set of hex keys
Standard set of open spanners
For the torque specifications, refer to
section 12.14.
Size M5 (8 mm (0.3 in))
-
-
-
Specification
M12, class A2, length 70 mm (2.75 in)
M16, class A2, length 70 mm (2.75 in)
1
M11, class A2, length 70 mm (2.75 in)
9AKK107992A3069-EN | 004