Installation - Ametek BROOKFIELD HPQA Series Operation Instructions Manual

Table of Contents

Advertisement

1.5 Installation

1.
Assemble the Helipath Quick Action Stand by bolting the extrusion to the base with the
provided bolt and washer. (Refer to assembly instructions in Appendix A of Figure 1.5.2)
2. Slide the Viscometer mounting handle into the clamp on the Helipath Quick Action stand
until it stops
3. Visually align Viscometer head with the extruded Lab stand rod and secure by tightening
molded star knob
4. Make sure that the power switch at the rear of the Helipath Quick Action stand is in the
OFF position. Connect the power cord to the power supply provided. Do not use any
other power supply or the warranty may be voided. Plug the power supply cable into the
Helipath power inlet
The Helipath Quick Action Laboratory stand must be used with the provided power supply.
Indoor use only.
The power supply must be earth grounded to maintain compliance with electrical certifications.
Verify that all I/O cables and accessories are clear of the top of the stand. A collision can cause
damage. If you use a folding USB drive, make sure the cover is folded to clear the stand.
See Figure 1.5.1
5. Turn the power switch on rear panel to the ON position
6. Press the
The Helipath Quick Action Lab stand will move up automatically during the homing process. Ensure the
Viscometer and Lab stand have adequate clearance at all positions. Remove spindles during homing
7.
Level your Viscometer or Rheometer using the two leveling feet located at the front of the stand
8. Your Helipath Quick Action Lab Stand is now ready for use
M-HPQA-001
HOME Icon to begin the homing process
Figure 1.5.1
H E L I PAT H Q U I C K A C T I O N L A B O R AT O R Y S TA N D - O P E R AT I O N A L M A N U A L
Power Switch
Figure 1.5.2
USB A Input
USB B Input
Power Input Jack
Figure 1.5.3
9

Advertisement

Table of Contents
loading

Table of Contents