Installing The Ep104 Pcb; Authorisation; Enclosure; Installing The Pcb - DAAB EP104 Instruction Manual

Automatic control unit
Hide thumbs Also See for EP104:
Table of Contents

Advertisement

DAAB AUTOMATIC CONTROL UNIT EP104

Installing the EP104 PCB

If you are installing the PCB in a dedicated enclosure, you must follow the instructions below. Otherwise, the requirements
of the applicable EU directive will not be met, FAAC Nordic's declaration of conformity will not be valid and the product
will not be authorised for use. If the PCB is installed elsewhere, the installer is responsible for obtaining CE approval for the
control system in its entirety.

• Authorisation

!
Persons installing the PCB in an enclosure must be trained and authorised for the particular task.

• Enclosure

The PCB must be installed in an enclosure designed for the surrounding environment, and must protect the electronics from
moisture, dust and contact.
The enclosure must provide protection to class IP54 or better and must be designed for screw fixing to a wall or bracket.
!
For outdoor use, or if there is a risk of condensation in the enclosure, a heating element must be used.

• Installing the PCB

The PCB must be secured to a metal plate. The PCB dimensions are shown below.
Use the screws, spacers and washers provided to fix the PCB as illustrated.
If the fixing plate is painted, scrape off the paint around the holes to ensure good contact between the spacers and the plate.
Fit the earth bar to the fixing plate, for connecting the external earth.
Bruksanvisning utgåva 1 för Programversion 4.06
11

Advertisement

Table of Contents
loading

Table of Contents