HPE Nimble Storage HF Series Hardware Manual page 62

Table of Contents

Advertisement

1
Array
2
Outer rails
3 Power cables
Save the original packaging.
2. Install the rail assemblies into the rack.
Note: To ensure that the array thumbscrews align correctly, install the rail assembly in exactly 4U of rack space.
You should insert the bottom stud on the rail kit into the bottom hole of the bottom unit of the allotted 4U of rack
space.
a) Align the bottom stud of the rail at the position you want.
b) Press the keeper latch and position the front studs in the rack. When the studs are engaged, release the keeper latch
to secure the front of the rail in the rack.
c) Align the back of the rail at the same rack position as the front.
d) Position the back studs in the rack and press the keeper latch. When the studs are engaged, release the keeper latch
to secure the back of the rail in the rack.
e) Repeat steps a through d on the other side.
The following diagram shows where the rail assemblies should be correctly installed in a rack.
4
Bezel
5
SAS cables
Documentation Feedback: doc-feedback-hpe-storage@hpe.com
Install the Expansion Shelf 62

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents