ProKiln GAC400 PROBE GAS SAMPLING SYSTEM | OI/GAC400-EN REV. A
Connect the internal electrical lines
Proceed as follows to connect internal electric lines with all
cables according to flammability acc. EN60332-1-2/-2-2, VW1,
FT1:
1. Turn off the general power
2. Turn off the UPS power supply
3. On the control cabinet: Turn off the main power switch.
4. On the control cabinet: Turn off the UPS power switch.
5. Install internal lines in accordance with the electrical
connection plan. For an overview see .
This applies to:
230/400 V AC cable to the probe cooling.
24 VDC cable to the probe cooling system
ProfiNet® shielded bus cable from to the probe
cooling system
230/400 VAC cable between water and cooler panel
for heat exchanger fan motor
230 VAC cable to probe retractor for brake probe
230 VAC cable to the retractor unit heating
24 VDC cable for safety installations
24 VDC cable to the retractor unit
ProfiNet® bus cable from to the retractor
Neighbouring metallic parts such as gratings, fences,
railings must also be grounded.
6. 230/400 VAC shielded cable from the Control Cabinet to
the Retractor motor.
Shielded motor cable: Connect the shield directly to
the shield terminal
converter
, not to the cable gland.
1
Run the cable separately in the control cabinet, not
together with the other lines in the cable duct.
Remove terminal blocks.
Connect to motor.
1
1 Frequency converter
Figure 45: Motor cable shield connection
2
below the frequency
2
2 Shield terminal
Requirements
See the electrical connection plan on page
Finalize all internal probe gas sampling system cable
connections before connecting external cable connections
and power supply
1