52
ProKiln GAC400 PROBE GAS SAMPLING SYSTEM | OI/GAC400-EN REV. A
... 7 Electrical connections
... Connecting internal electric cables
Overview
A
D
E
A Power supply and cable connections between units
B General power supply
C Uninterruptible power supply (UPS)
Figure 44: Power supply and signal interfaces
D Signals from Central Control Room / Analysis system to the ProKiln
system
E System Status signals to Central Control Room / Analysis system from
the ProKiln system
B
C