Installation Verification; Checking The Ap; Checking Cable Connections; Checking The Power Supply - Ruijie RG-AP680-AR Hardware Installation And Reference Manual

Table of Contents

Advertisement

Hardware Installation and Reference Guide
Figure 3-13
Caution
 After the cables are bundled, check whether waterproof measures are taken properly.
 The circle in the preceding figure shows the fastening rope installation. Use a M8 screw
to lock one end of the fastening rope on the back of the device and lock the other
end of the fastening rope in a safe position.
3.8

Installation Verification

3.8.1

Checking the AP

Verify that the external power supply matches with the AP.
Verify that the AP is securely fastened.
3.8.2

Checking Cable Connections

Verify that the twisted pair cable matches the port.
Verify that cables are properly bundled.
3.8.3

Checking the Power Supply

Verify that the power cord is properly connected and compliant with safety
requirements.
Turn on the power supply to supply power to the AP. Verify that the AP works properly.
Bundling the Cables on the Support Using a Cable Tie
34
Installation