When Work Is Finished - Fayat Group Dynapac F2500W Operation & Maintenance Manual

Paver finisher type 896
Table of Contents

Advertisement

When work is finished

- Run the paver finisher empty and stop it.
- Move the drive lever (1) to the central position, set preselector (2) to "0" and set the
speed adjuster (3) to minimum.
- Switch the auger, conveyor, tamper and vibration functions "OFF".
- Lift the screed: set switch (4) to centre position, switch (5) to the top position and
switch (6) to lifting.
- Set crossbeam lock.
- Retract the screed parts to the basic screed width using switch (7) and lift the auger.
Where applicable, completely extend the levelling cylinders using switch (8).
- Close hopper halves, set hopper transport safeguards.
- Set tampers to "manual"; while operating the tampers at a low speed, let any ma-
terial residues drop out.
- Switch tampers "OFF".
- Switch the screed heater system off.
- Switch lighting "OFF".
- Switch off the ignition (9).
- Close the main shut-off valves and the bottle valves for the screed gas heater system.
- Remove the levelling units and stow them away in the boxes, close all flaps.
- Remove all parts that extend beyond the paver finisher contour or secure them
if the paver finisher is to be transported over public roads on a low-bed trailer.
- Read and check the operating hour meter (10) to determine whether maintenance
work must be performed (see chapter F).
- Cover and lock the operating panel.
- Remove material residues from the screed and the paver finisher and spray all
parts with separator fluid.
NOTE
Caution! Possible damage to the engine electronics
- After the drive engine is switched off, the on-board
voltage may not be switched off until after a period
> 100 seconds (main switch).
Always observe the operating instructions!
D 42 35

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dynapac f2500ws896

Table of Contents