Huawei NetEngine 8000 F Hardware Manual page 460

Table of Contents

Advertisement

HUAWEI NetEngine 8000 F
Hardware Guide
Assembling the JG2 Terminal and Power Cable
Bacnground
Figure 4-88
Figure 4-88 Components of a JG2 terminal and a power cable
A. Heat shrink
tubing
Procedure
1.
Issue 05 (2023-03-31)
shows the components of a JG2 terminal and a power cable.
B. JG2 terminal
Strip a part of the insulation to expose the cable conductor with a length of L,
as shown in
Figure
4-89. The recommended values of L are listed in
4-20.
Figure 4-89 Stripping a power cable (JG2 terminal)
Copyright © Huawei Technologies Co., Ltd.
4 Hardware Installation and Parts Replacement
C. Insulation layer
of a power cable
D. Conductor of a
power cable
Table
449

Advertisement

Table of Contents
loading

This manual is also suitable for:

V800r012c10

Table of Contents