Figure 4-340 Installed OT terminal
Install two OT terminals on a post.
Before you install two OT terminals on a post, ensure that the two terminals
can be installed on the post and that the electrical connecting pieces have a
large contact area. Two OT terminals can be installed using any of these
methods:
Bend the upper OT terminal at a 45- or 90-degree angle, as shown in
Figure
4-341.
Cross the two terminals, as shown in
Figure 4-341 Bending the upper OT terminal at a 45- or 90-degree angle
Figure 4-342 Crossing two terminals