HUAWEI NetEngine 8000 F
Hardware Guide
2.
Installing Cabinet Doors
1.
Issue 05 (2023-03-31)
cabinet is not horizontal, adjust the adjusting anchor by using a socket
wrench.
Figure 4-31 Leveling the cabinet
NO TE
Both the gap between cabinets and the vertical deviation should be no less than
3 mm.
Restoring the ESD floor.
Figure 4-32 Restoring the ESD floor
NO TE
The ESD floor has been removed before you determine the installation position of the
supports. Cut the ESD floor according to the size of the cabinet.
For underfloor cabling, place the cables before you restore the ESD floor.
Installing the cabinet doors.
NO TE
Install the cabinet door after the inside components and cables. To install the
components inside the cabinets and cables, see the Installation Guide.
a.
Align the door with the front face of the column.
b.
Place the door on the lower lintel and close the door till the lower pin
automatically inserts into the hole in the lower lintel.
Copyright © Huawei Technologies Co., Ltd.
4 Hardware Installation and Parts Replacement
372

Advertisement

Table of Contents
loading

This manual is also suitable for:

V800r012c10

Table of Contents