Proline Promass 84 MODBUS RS485
#
Endress+Hauser
3
Installation
3.1
Incoming acceptance, transport and storage
3.1.1
Incoming acceptance
On receipt of the goods, check the following points:
• Check the packaging and the contents for damage.
• Check the shipment, make sure nothing is missing and that the scope of supply matches your
order.
3.1.2
Transport
The following instructions apply to unpacking and to transporting the device to its final location:
• Transport the devices in the containers in which they are delivered.
• The covers or caps fitted to the process connections prevent mechanical damage to the sealing
faces and the ingress of foreign matter to the measuring tube during transportation and storage.
Consequently, do not remove these covers or caps until immediately before installation.
• Do not lift measuring devices of nominal diameters > DN 40 (> 1 ½") by the transmitter housing
or the connection housing in the case of the remote version (→ å 5). Use webbing slings slung
round the two process connections. Do not use chains, as they could damage the housing.
• In the case of the Promass M / DN 80 (3") sensor, use only the lifting eyes on the flanges to lift
the assembly!
Warning!
Risk of injury if the measuring device slips.
The center of gravity of the assembled measuring device might be higher than the points around
which the slings are slung. At all times, therefore, make sure that the device does not unexpectedly
turn around its axis or slip.
Fig. 5:
Instructions for transporting sensors with > DN 40 (> 1 ½")
Installation
a0004294
11
Need help?
Do you have a question about the Proline Promass 84 MODBUS RS485 and is the answer not in the manual?
Questions and answers