Download Print this page

OLT SSGS1216-FJ-Ply Assembly Manual page 9

12x16 sunshed garden shed with plywood roof

Advertisement

You can find the
Square Drive Bit
for the screws in
with the Hardware
Kit Bag.
2.
When correctly positioned, attach each Joist with 4 - 2 1/2" screws (2 per end).
Complete all Floor Frame and Joist connections. You can find the Square Drive Bit for the screws
in with the Hardware Kit Bag.
3.
Lay out 75" Floor Frames as shown above. Attach each completed frame to the next with 8 - 2
1/2" screws (24 Total). Once complete assemble 66 1/2" Floor Frames the same way.
4.
Locate Floor Runners and Wide Floor
Runners. Lay out Floor Runners above
Completed Floor Frame section as shown
above. The 3 1/2" wide Floor Runner should be
flush with the edge of the floor frame. 5 1/2" wide
Floor Runner should overhang the edge of the
floor Frame by 2 3/4". Third set of Floor Runners
should be centered on Floor Frame.
Toll Free 1-888-658-1658
5 1/2"
Overhanging
2 3/4"
Parts (Steps 4 - 9)
Wide Floor Runners
(1 1/2" x 5 1/2" x 56") x 2
Wide Floor Runner
(1 1/2" x 5 1/2" x 70") x 1
Floor Runners
(1 1/2" x 3 1/2" x 38") x 4
(1 1/2" x 3 1/2" x 72") x 8
www.outdoorlivingtoday.com
Page 9
Floor Runner
sales@outdoorlivingtoday.com
Flush
Hardware (Steps 4 - 9)
S1 - 2 1/2" Screws
x 116 total

Advertisement

loading

This manual is also suitable for:

Fj bevel