Download Print this page

OLT SSGS1216-FJ-Ply Assembly Manual page 20

12x16 sunshed garden shed with plywood roof

Advertisement

30.
Position and attach Side Top Plates on Side
Riser Plates. 65 3/4" side plates are on the outside
with the 45 1/2" plate in the center. Angle of Side
Plates should match angle of F&R Top Wall
Plates. Attach each piece with 4 - 1 1/4" screws.
Complete both sides of shed.
31.
Locate Triangular Gable Half Walls for both
sides of shed. Align framing and wall siding lap
together. Screw center wall framing of each piece
together with 4 - 2 1/2" screws. Note: Prior to
attaching, try each combination of Gables for best
fit.Tip of Gables are separate pieces that need to be
attached on in Step 32.
Toll Free 1-888-658-1658
Top and Side
plates flush
Male / Female Gable
Siding Overlap
www.outdoorlivingtoday.com
Page 20
Parts (Steps 30)
Side Top Plates
(3/4" x 2 1/2" x 45 1/2") x 2
(3/4" x 2 1/2" x 65 3/4") x 4
Gable End tucked inside
Gable.
Parts (Steps 31-32)
Gable Half Walls x 4
sales@outdoorlivingtoday.com
Hardware (Steps 30)
S2 - 1 1/4" Screws
x 24 total
Hardware (Steps 31-32)
S1 - 2 1/2" Screws
x 8 total
S3 - 2" Screws
x 8 total

Advertisement

loading

This manual is also suitable for:

Fj bevel